CLEARANCE INDUSTRIAL INSPECTION — PHOENIX METRO

EVERY CRACK.
EVERY CODE.
DOCUMENTED.

Pre-close and compliance inspections for distribution centers, cold storage, and manufacturing plants across the Phoenix industrial corridor.

SCOPE
// INSPECTION SCOPE ESTIMATOR

KNOW YOUR
EXPOSURE BEFORE
YOU CLOSE.

Input your building parameters. Receive an instant inspection scope, time estimate, and report depth — no email required.

PROPERTY PARAMETERS

AWAITING PROPERTY PARAMETERS

// DOCUMENTED DEFICIENCY ARCHIVE

WHAT GETS
MISSED COSTS
MORE THAN
THE DEAL.

Real deficiencies from real inspections. Each finding below includes the applicable code reference and the cost of deferral.

Close-up of industrial sprinkler head with obstruction from pallet racking in warehouse aisle
THERMAL IMAGING
CRITICAL
Fire Suppression

Sprinkler Head Obstruction — Racking Aisle 7-C

Pallet stack within 18" of sprinkler deflector, blocking full discharge coverage.

VIEW DETAIL
Corroded steel column base plate in cold storage warehouse showing rust and structural deterioration
STRUCTURAL
CRITICAL
Structural Racking

Column Base Plate Corrosion — Cold Storage Bay 2

Moisture intrusion compromised base plate integrity. Estimated 40% load capacity reduction.

VIEW DETAIL
Industrial loading dock leveler showing hydraulic mechanism and dock bay from interior warehouse view
DOCK SYSTEMS
MAJOR
Dock Equipment

Dock Leveler Hydraulic Failure — 6 of 18 Bays

Leveler lip fails to hold position under load. Forklift crossing creates fall exposure.

VIEW DETAIL
Concrete warehouse floor showing crack network and joint failure in forklift travel lane
SLAB SURVEY
MAJOR
Slab Condition

Transverse Crack Network — High-Traffic Forklift Lanes

Crack widths exceeding 1/4" in primary travel lanes. Joint sealant failed in 60% of floor joints.

VIEW DETAIL
Industrial fire wall showing unsealed conduit penetrations and electrical conduit runs through concrete block wall
FIRE SYSTEMS
CRITICAL
Fire Wall Integrity

Fire Wall Penetration — Unsealed Conduit Runs

14 unsealed conduit penetrations through rated 2-hour fire wall between storage and processing.

VIEW DETAIL
Large warehouse interior showing high-bay lighting fixtures above receiving area with industrial shelving
ELECTRICAL
MONITOR
Lighting & Electrical

High-Bay Fixture Spacing Deficiency — Receiving Area

Foot-candle levels 35% below OSHA minimums in receiving staging area. Two fixtures failed.

VIEW DETAIL
// AGGREGATE DATA — 847 INSPECTIONS

Average pre-close inspection uncovers 14.7 deficiencies per 100,000 sq ft.

SCHEDULE YOUR INSPECTION →
847
INSPECTIONS COMPLETED
Since 2014
94M
SQ FT DOCUMENTED
Across AZ, NV, NM
48HR
REPORT DELIVERY
Pre-close standard
12
YEARS FIELD EXPERIENCE
Industrial only
// INSPECTOR CREDENTIALS

ONE INSPECTOR.
TWELVE CODES.
ZERO CONFLICTS.

Marcus Delgado has spent 12 years walking the concrete floors of industrial facilities across the Southwest — not as a generalist home inspector who occasionally does warehouses, but as a specialist who has never inspected a residential property.

Every engagement produces a report that your facility manager, insurance carrier, and legal counsel can read without interpretation. Code citations are precise. Photographs are annotated. Remediation costs are estimated against current Phoenix-area contractor rates.

Industrial-only practice — no residential, no general construction
Thermal imaging camera deployed on every engagement
Reports cite specific code sections, not general observations
Available for re-inspection after remediation at no additional charge
APPLICABLE CODE STANDARDS
NFPA 13/25
Fire Suppression Inspection
National Fire Protection Association
ANSI MH16.1
Industrial Racking Systems
American National Standards Institute
OSHA 30-HR
General Industry
Occupational Safety & Health Administration
IBC / IFC
Building & Fire Code
International Code Council
ACI 318/360
Concrete Structures
American Concrete Institute
NFPA 70E
Electrical Safety
National Fire Protection Association

"The report Marcus produced on our Goodyear acquisition was the document that gave us confidence to proceed — and the leverage to negotiate $340,000 off the asking price."

Jennifer Okafor
VP ACQUISITIONS — SENTINEL LOGISTICS GROUP
DISTRIBUTION CENTER·COLD STORAGE·MANUFACTURING PLANT·FLEX SPACE·FULFILLMENT CENTER·CROSS-DOCK FACILITY·FOOD-GRADE PROCESSING·HAZMAT STORAGE·MEZZANINE STRUCTURE·DISTRIBUTION CENTER·COLD STORAGE·MANUFACTURING PLANT·FLEX SPACE·FULFILLMENT CENTER·CROSS-DOCK FACILITY·FOOD-GRADE PROCESSING·HAZMAT STORAGE·MEZZANINE STRUCTURE·
BOOK
// SCHEDULE YOUR WALKTHROUGH

BEFORE YOU SIGN,
WALK EVERY AISLE.

INSPECTION REQUEST48-HR RESPONSE GUARANTEED

NO COMMITMENT REQUIRED — CONFIRMATION WITHIN 48 HOURS

NOT READY TO BOOK?

Download a Redacted Sample Report

See the exact documentation depth, code citation format, and photo annotation standard before you commit. 47-page report from a 2024 Phoenix distribution center inspection.

DIRECT LINE
(602) 555-0182marcus@clearanceinspection.com
COVERAGE AREA
Phoenix Metro · Tucson · Las Vegas · Albuquerque